Hasketon Road in Woodbridge shuts 24 hours a day from 23 November to 16 December for a zebra crossing. Leiston's B1122 shuts this weekend, Friston at night.
Hasketon Road in Woodbridge shuts 24 hours a day from Monday 23 November to Wednesday 16 December, so a new zebra crossing can be built. Suffolk County Council’s ongoing improvement schemes page gives the dates. Traffic is sent via Grundisburgh Road and the A12. The road is then resurfaced overnight, 7pm to 5am, from Thursday 17 to Saturday 19 December.
This week, Leiston’s B1122 shuts all weekend again, from 8pm on Friday 13 November to 5am on Monday 16 November. It is in the Sizewell C works tracker bulletin of 6 November. The Friston junction on the main road to Aldeburgh now shuts from 8pm to 6am on Monday to Thursday nights, until 18 December.
Updated 10 November: rechecked against the Sizewell C bulletin of 6 November, the county council’s improvement schemes page and closure orders published on the Public Notice Portal to 5 November. New: Hasketon Road, Woodbridge (23 November to 19 December); Cherry Tree Road, Kingston Road and Westholme Close, Woodbridge (16 to 20 November); Kingston Road, Woodbridge (11 November); School Road, Knodishall (23 to 30 November); School Road, Tunstall and Chapel Road, Otley (16 November onwards); overnight lights at Friday Street. Over since the last update: the A12 Darsham weekend, the first Leiston weekend, the B1122 Yoxford to Middleton nights, and the Southwold, Grundisburgh, Sudbourne and Rendlesham closures.
Everything here was checked on Tuesday 10 November 2026 against the Sizewell C works tracker bulletin published on Friday 6 November, Suffolk County Council’s improvement schemes page, and the closure orders on the Public Notice Portal up to 5 November.
Shut right now
- Woodbridge, St Johns Hill area: last phase of resurfacing, 8am to 6pm, until Wednesday 11 November. The county order covers Beaconsfield Road, Sun Lane, Victoria Road, Fitzgerald Road, St Johns Terrace and St Johns Hill between Sun Lane and Castle Street, with no waiting while each phase runs. The final phase runs 9 to 11 November; the order does not say which street falls in it. Diversions use Castle Street, Mill Lane, North Hill and Pytches Road. Enquiries to Suffolk Highways on 0345 606 6171.
- Kingston Road, Woodbridge: closed on Wednesday 11 November, 9.30am to 3.30pm, from the B1438 to Cumberland Street, for telecoms cabling. The one-way rule is lifted so residents can get in and out. Diversion via Station Road and Cumberland Street.
- Main Road, Martlesham: one-way from Felixstowe Road towards the A12, 24 hours a day, to 26 February 2027. Details below.
- Garrison Lane (A154), Felixstowe: closed in nine phases until 12 February 2027, for gas mains replacement, from High Road West down to Orwell Road, with short stretches of Cobbold Road, Newry Avenue, Mill Lane, Chaucer Road and Orwell Road at the junctions. For the first seven phases, northbound traffic goes via Orwell Road, Leopold Road, Hamilton Road, Beatrice Avenue and Grove Road; southbound via Orwell Road, Leopold Road, Hamilton Road, Crescent Road, Highfield Road and Orwell Road. Phases eight and nine divert via Langer Road, Walton Avenue, the A14, Candlet Road and Grove Road. The county’s order, republished on 31 October, gives 2 November to 12 February but no dates for each phase. Contractor TMO Highways, 01379 676462.
- Friston junction: shut at night, 8pm to 6am, Monday to Thursday, until 18 December. It covers the A1094 Farnham Road, the B1069 Snape Road and the B1121 Aldeburgh Road around the junction, for Scottish Power Renewables. The county order’s diversion uses the B1122, B1353, B1069, B1119, B1121, A12 and A1094.
- Eastbridge Road, Theberton: closed at all hours until 12 November. The bulletin of 6 November has pushed the end date back from 9 November. Diversion via Baker’s Lane, Onner’s Lane and the B1122.
- Westleton: temporary traffic lights in the south and north of the village until 14 December, and these closures for the Sizewell C Westleton scheme:
- Mill Street, western end: to 13 November, says the bulletin (the order says 14 November). Diversion via Mill Street and Baker’s Lane.
- The Hill, eastern end: 9 to 25 November, weekdays, 7am to 5pm.
- Yoxford Road, south side of the triangle: 10 to 25 November, weekdays, 7am to 5pm.
- B1125 Reckford Road, Westleton: closed from 9 November to 22 December, then 4 January to 1 March 2027, for 1,400 metres north from Rectory Road, for an Essex and Suffolk Water main. The county order diverts traffic via the A12 and B1122.
- The Green, Knodishall: closed to 14 November. Diversion via Theberton Road, Saxmundham Road, Buckleswood Lane and the B1119.
- Prospect Place, Leiston: resurfacing, 8am to 5pm, 10 to 12 November, with a manned gated closure.
- Stoney Road, Grundisburgh: closed to 11 November, for 50 metres from Hill Farm Road, for a water connection, on a long signed diversion through Clopton, Witnesham, Tuddenham and Culpho.
- Bull Drive, Kesgrave: footway closed between numbers 32 and 34 on 10 and 11 November, for a stop tap.
- Denny Lane and Church Lane, Kelsale: closed in phases to 23 November, for gas main replacement. Diversion via Bridge Street.
- Footpath Leiston cum Sizewell 3: closed 7am to 6pm on weekdays until 13 November, for works near the level crossing. It reopens at weekends.
- Footpath 6, Tunstall, and the boardwalk on Footpath 1, Iken: closed until 7 April 2027 because the boardwalks are damaged. There is no diversion.
- Bridleway 3, Ramsholt: closed for 300 metres until 5 April 2027, for flooding works. Riders can use Bridleways 4 and 6; walkers can follow the permissive path.
- Footpaths 9 and 10, Brightwell: closed until 7 April 2027 during construction of the new development, with no diversion route.
- Footpath 17, Kelsale: closed for 65 metres from North Green until 19 May 2027. The Minister has extended the order, first made on 20 May, under a notice published on 2 November.
Hasketon Road, Woodbridge: shut from 23 November
The county council’s scheme page sets out two phases:
| Phase | Dates | Hours | Diversion |
|---|---|---|---|
| 1: new zebra crossing | Mon 23 Nov to Wed 16 Dec | 24 hours, closed both ways | Grundisburgh Road and the A12 |
| 2: resurfacing and road markings | Thu 17 Dec to Sat 19 Dec | 7pm to 5am | Through the town centre via Theatre Street, the Thoroughfare, Melton Road, Woods Lane and the A12, or the reverse via Ipswich Road and Station Road |
Full story: Hasketon Road shut for 24 days from 23 November.
The scheme page does not say which stretch of Hasketon Road closes. A separate county notice, published on 4 November, proposes the zig-zag no-waiting zone for the crossing. It puts the crossing on Hasketon Road 24.7 metres south of its junction with Catherine Road, with the controlled area 41.6 metres long. Comments on that order go to Suffolk County Council Legal Services, at highwayslegal@suffolk.gov.uk, by Wednesday 25 November. Live updates are on one.network under scheme number 15620. We found no closure order for Hasketon Road on the Public Notice Portal by 5 November.
Also in Woodbridge, from Monday 16 to Friday 20 November, 8am to 5pm, the county is sealing footways one road at a time:
- Cherry Tree Road first, with a diversion via Ipswich Road and Kingston Farm Road.
- Kingston Road next, via Cherry Tree Road and Ipswich Road.
- Westholme Close last, with no diversion.
The county’s closure notice of 5 November names the second road as Kingston Farm Road; its scheme page says Kingston Road. Watch the signs.
Leiston: three more weekends and two weeks of nights
The bulletin of 6 November lists the next weekend closure: 8pm Friday 13 November to 5am Monday 16 November. It shuts about 300 metres of the B1122 between Potters Street and Lovers Lane and the Eastbridge Road junction. The Sizewell C order of 23 October, for the Plaza Roundabout, is wider. It closes the B1122 Abbey Road from Rowley Mews to Potters Street, Eastbridge Road for about 400 metres, and Lovers Lane from Abbey Road to King George’s Avenue.
Then two more weekends and two weeks of nights, under a Sizewell C order published on 30 October. The same three roads close:
- all weekend, 8pm Friday 20 to 5am Monday 23 November
- all weekend, 8pm Friday 27 to 5am Monday 30 November
- 8pm to 5am on weeknights, from Monday 23 November to 5am Saturday 5 December
The order’s diversion for Abbey Road is the B1122, B1069, A1094, A12 and B1122; for Eastbridge Road, Church Road and Bakers Hill or Onner’s Lane; for Lovers Lane, King George’s Avenue and the B1122. The bulletin of 6 November does not list these dates yet; it says further detail will follow on the works tracker.
Also in Leiston and Knodishall:
- Main Street, Leiston: multi-way traffic lights on Wednesday 11 November, 9am to 3.30pm, for utility trial holes.
- High Street, Leiston: traffic lights on 12 and 13 November, 9am to 3.30pm, for the same reason.
- School Road, Knodishall: closed 24 hours a day from 23 to 30 November, from Church Road to Hillcrest, for masonry repairs and vegetation clearance. Diversion via Church Road, Saxmundham Road, Waterloo Avenue, Park Hill, Hayling’s Road, Leiston Road and Mill Road.
Treat the orders as the legal position and the bulletin as what gets signed on the road, and check the signs on the day.
Main Road, Martlesham: one-way for 20 weeks
Suffolk County Council’s highway scheme on Main Road, Martlesham, between the A12 and Nunn Close, runs from Monday 19 October to Friday 26 February 2027. The scheme page still gives those dates on 10 November.
- One-way, 24 hours a day: Main Road is closed in the direction from Felixstowe Road towards the A12. Traffic can still travel from the A12 towards Felixstowe Road.
- Diversion towards the A12: Main Road, The Street, Top Street, the B1438 and the A12 southbound.
- Two full overnight closures for resurfacing, dates still not set.
- Felixstowe Road, Martlesham: closed 15 to 26 February 2027, for 100 metres south of Main Road. Diversion via Anson Road, the A12 northbound and Main Road.
Full story: Main Road, Martlesham one-way for 20 weeks.
Already over
These were on this page last week. Their published end dates have passed.
- A12 Darsham weekend closure: booked for 8pm Friday 6 November to 5am Monday 9 November, for a water connection. The bulletin of 6 November still listed it; we have no report of it being called off.
- The first Leiston weekend, 6 to 9 November, on the B1122 between Potters Street and Lovers Lane and Eastbridge Road.
- B1122, Yoxford roundabout to Middleton: the Monday to Thursday night closures to 6 November.
- Church Street, Southwold (to 6 November), Half Moon Lane, Grundisburgh (3 to 5 November), Snape Road, Sudbourne (to 8 November) and Sycamore Drive, Rendlesham (to 9 November).
- The first two phases of the St Johns Hill resurfacing in Woodbridge, 2 to 9 November.
- Sizewell C wide loads on 5 and 6 November.
- Woodbridge 20mph: the deadline for objections to the county’s proposed order was Friday 6 November. Background: Woodbridge 20mph limit by early 2027.
Dated for later in November and beyond
- Friday Street, A1094: overnight traffic lights, 7pm to 6am, on the nights of 11 to 12 and 16 to 17 November, between Kettles Lane and the Friday Street roundabout.
- Leiston B1122 and Eastbridge Road: all weekend, 13 to 16 November. See the Leiston section.
- A12 Marlesford: two-way traffic lights, 8pm to 5am, 16 November to 2 December, for improvement works.
- Woodbridge footways, 16 to 20 November: Cherry Tree Road, Kingston Road and Westholme Close. See the Hasketon Road section.
- School Road, Tunstall: closed 16 to 20 November, for 15 metres either side of Mulberry House, for an electrical connection. Diversion via the B1069 and Dock Farm Road.
- Chapel Road and Hall Lane, Otley: closed on 16 November, 9.30am to 3pm, for cabling, with a long diversion through Cretingham and Earl Soham.
- Hasketon Road, Woodbridge: closed 24 hours from 23 November to 16 December, then overnight to 19 December.
- Leiston B1122 Abbey Road, Eastbridge Road and Lovers Lane: all weekend 20 to 23 and 27 to 30 November, and weeknights 8pm to 5am from 23 November to 5 December.
- School Road, Knodishall: closed 23 to 30 November.
- Westleton, Village Green: the southern end, opposite Baker’s Lane, closes from 25 November to 18 December, says the bulletin. A Sizewell C order published on 4 November also closes about 15 metres of Village Green from its junction with Blythburgh Road for the same dates, with a diversion via Baker’s Lane, Darsham Road and the B1125.
- Westleton, The Street (B1125): shut at night, 7pm to 5am, from 14 to 24 December, with access from the north.
- Footpaths Kelsale 13 and Middleton 16A: diverted until 30 June 2028 for the Sizewell Link Road, on a signed route.
- Footpath Farnham 4: closed from 30 September 2026 to 19 November 2027 for the two-village bypass at Friday Street.
Rendham Road, Saxmundham: starting mid-November
The Sizewell C order of 19 October closes Rendham Road (B1119), Saxmundham, at the A12 from 9 November to 11 December. The bulletins of 30 October and 6 November do not list that closure. But Sizewell C’s project update for October, published on 6 November, says the next A12 improvement works will be at the B1119 junction in Saxmundham, and “will start in Mid-November”. It gives no closure dates. Check the signs.
Other A12 work finishing
The same project update says:
- Darsham: the A12 works for the northern park and ride are due to finish on Tuesday 10 November. The speed limit goes back to 40mph once the roundabout’s street lights are working.
- Marlesford: the A12 works are due to be “fully completed by Mid-November”, with a new 30mph limit. The overnight lights from 16 November are still listed in the bulletin.
- Leiston: Sizewell C aims to have the Plaza Roundabout working in mid-November, joining the B1122 and Eastbridge Road.
Closed for months, or for good
- George Road, Leiston: closed until September 2028. Diversion via Harrow Lane, Abbey Lane and the B1122.
- Hawthorn Road, Leiston: closed until 30 April 2027. Same diversion.
- Pretty Road, Leiston: closed until Q3 2027 while an overbridge is built. Same diversion.
- Fordley Road, Middleton-cum-Fordley: closed until Q3 2027. Diversion via Fordley Road, Town Farm Lane, the A12 and B1122.
- Littlemoor Road, Middleton: closed since 19 November 2025, and not expected to reopen.
- Hill Farm Road, Farnham: fully closed since 12 January 2026, diverting via the A12, A1094 and Botany Farm Lane.
- Footpath 12, Ufford: closed at the bridge since 22 April 2026, and extended by the Minister to 30 September 2027. The bridge is damaged and there is no diversion route.
- Eleven footpaths and bridleways at Dunwich and Westleton: closed until 19 February 2027 after the wildfire, with no alternative route. Details: Dunwich Heath paths shut until February.
Thirty miles of A12, and where each town stands
Almost every closure north of Wickham Market traces back to Sizewell C. The project is building a power station at Leiston, a link road to reach it, a bypass round two A12 villages, two park and ride sites and a rail route, spread along thirty miles of the A12 and the lanes either side. The exceptions are the county’s own schemes at Martlesham, Woodbridge and Leiston, and the gas, water and cabling jobs at Felixstowe, Westleton and the villages.
The East Suffolk line
Trains returned to the East Suffolk line on Monday 2 November, after nine days of replacement buses for the Saxmundham junction renewal, according to the timetable we read on 31 October. We could not read a live timetable or Greater Anglia’s own notices on 10 November, so check before you travel. More: nine days of buses on the East Suffolk line.
Overnight trains through Woodbridge and Melton
The Sizewell C bulletin of 6 November carries the construction train pattern again. It is not dated to a particular week:
- Train 1 passes Ipswich at about 22:19 (22:21 on Monday, 22:37 on Thursday) and reaches the site at about 00:45, or 01:02 on the Wednesday night. It runs five nights a week.
- Train 2 passes Ipswich at 22:56 and reaches the site at about 01:41, or 01:57 on the Thursday night. It runs Monday to Thursday only.
- Empty trains head back out at about 02:10 and 03:34 (03:30 on the Friday), passing Ipswich at about 04:32 and 05:45 (05:41 on the Friday).
Background: Sizewell C night trains through Woodbridge.
30mph on the A12 and the lanes
These are not temporary night limits. They stay while the bypass, the link road and the park and ride sites are built. The bulletin of 6 November lists:
- A12 between Kelsale and Yoxford, for the link road and its roundabout.
- A12 at Darsham, for the northern park and ride roundabout.
- B1122, Lover’s Lane and Sizewell Gap.
- Buckleswood Road and Westward Ho, Leiston, for the Green Rail Route.
- Eastbridge Road, for the link road.
- B1125, at 30mph and 50mph, with speed cameras.
Traffic signals remain in place on Lover’s Lane, B1122 Abbey Road and Buckleswood Road.
What could not be confirmed today
- Which stretch of Hasketon Road closes from 23 November. The scheme page says only “Hasketon Road, Woodbridge”; the crossing itself sits just south of Catherine Road.
- When Rendham Road at Saxmundham actually closes. The order says 9 November to 11 December; Sizewell C says the junction work starts in mid-November, but gives no closure dates.
- Whether the Leiston weekends of 20 and 27 November go ahead as ordered. The order of 30 October books them; the bulletin of 6 November does not mention them yet.
- Which Woodbridge streets are in the final resurfacing phase to 11 November, and the dates of each Garrison Lane phase in Felixstowe.
- The dates of the two overnight full closures on Main Road, Martlesham. Still not on the county’s scheme page on 10 November.
- National Highways closures on the A14 and the A12 south of Seven Hills. Its closure report loads in the browser only.
- Whether trains are running normally on the East Suffolk line today.
What it means for you
If you use Hasketon Road to get between Woodbridge and the A12 or Grundisburgh Road, plan another route from 23 November until 16 December. The signed diversion is Grundisburgh Road and the A12. Overnight from 17 to 19 December, the diversion runs through the town centre instead.
If you live on Cherry Tree Road, Kingston Road or Westholme Close, expect a closure on your road for part of the week of 16 November, between 8am and 5pm.
If you drive to Aldeburgh or Snape at night, the Friston junction is shut from 8pm to 6am on Monday to Thursday nights until 18 December.
If you are heading to Leiston or Sizewell at the weekend, the B1122 is shut from 8pm on Friday 13 November to 5am on Monday 16 November, and the orders book two more weekends after that.
If you use Main Road, Martlesham to reach the A12 or Ipswich, you will be sent round via Top Street and the B1438 until late February. In Felixstowe, Garrison Lane is closed in stretches until 12 February.
Three practical points:
- Check the day before, not the week before. Leiston weekends have been called off, dropped or postponed several times since 2 October, and the latest order adds weekends the bulletin does not list yet.
- A bulletin is not a legal order, and an order is not a guarantee. The two still disagree about Rendham Road and Mill Street in Westleton.
- Woodbridge has its own works now. Hasketon Road and the footway jobs are county council schemes, not Sizewell C, and they run in daytime or round the clock.
Checking before you set off
- Suffolk County Council publishes live works on the Causeway one.network map: current and planned roadworks in Suffolk. Its own schemes, including Hasketon Road, Main Road, Martlesham and Prospect Place, Leiston, are on the ongoing improvement schemes page.
- Sizewell C publishes a weekly bulletin at the Sizewell C works tracker. The current edition, on 10 November, is the bulletin published on 6 November, with the wide load list for the week of 9 November. The tracker deletes each bulletin when the next one lands.
- The closure orders are public notices. Darsham is in the county bundles of 24 September and 3 October, and the Sizewell C order of 28 September; the November weekend is in the Sizewell C order of 16 October. Leiston is in the orders of 18 September and 25 September (Eastbridge Road), and the weekends from 23 October are in the order of 2 October. The Hacheston slips are in the orders of 5 October, southbound and northbound; the Saxmundham crossings here. Buckleswood Lane is here, the Theberton crossroads here, Tinker Brook here and the Sizewell C footpaths here. Main Road, Martlesham is in the county bundle of 1 October. The county bundles of 3 October (Aldringham), 5 October (Sweffling), 7 October (Brightwell, Trimley St Martin) and 8 October (Southwold, Foxhall) carry the rest. Added since 10 October: the county bundles of 10 October (Main Road, Martlesham phases, Holly Lane), 13 October (Sun Lane), 15 October (Theatre Street telecoms, Leiston, Kelsale, Rendlesham) and 15 October (Theatre Street water works, Little Bealings, Waldringfield), the Sizewell C order for Mill Street, Westleton, the Eyke speed limit proposal and the Woodbridge 20mph proposal of 16 October. Added since 17 October: the county bundles of 17 October (Sudbourne), 19 October (Wilford Bridge Road, Melton) and 22 October (Woodbridge resurfacing, Garrison Lane, Grundisburgh) and 22 October (Church Street, Southwold), and the Sizewell C orders for Rendham Road, Saxmundham, The Hill, Westleton, Yoxford Road, Westleton and the footpaths at Kelsale, Middleton and Leiston. Added since 24 October: the Sizewell C order of 23 October for the Leiston weekend of 13 to 16 November. Added since 28 October: the county bundles of 23 October (Ramsholt bridleway), 24 October (Theatre Street, Kelsale, Rendlesham, Waldringfield, Leiston), 26 October (Theatre Street water works, Little Bealings), 27 October (St Johns Terrace, Grundisburgh, Tunstall and Iken footpaths) and 29 October (A12 Darsham nights, B1125 Reckford Road, Friston, Benhall, Grundisburgh, Kesgrave). Added since 31 October: the Sizewell C order of 30 October for the Leiston weekends and nights from 20 November. Added since 4 November: the county bundles of 31 October (Garrison Lane, Woodbridge resurfacing, Kingston Road), 2 November (Footpath 17, Kelsale), 4 November (Hasketon Road zebra crossing waiting restrictions) and 5 November (Cherry Tree Road, Tunstall, Otley), and the Sizewell C order of 4 November for Village Green, Westleton.